The Riverside Local School District projects consists of a $31 million program that includes two new 73,000sf elementary schools that will house K-5 students.

  • Owner: Riverside Local School District
  • Co-Owner: Ohio Facilities Construction Commission
  • Architect: Fanning Howey Architects
  • CM at Risk: ICON, LLC.
  • Location: Painesville, Ohio
  • Size: Madison Avenue ES - New 73,000sf K-5 School; Concord ES - New 73,000sf K-5 School
  • Value: $31 Million
  • Documents: January 15, 2018
  • Bid Date: February 9, 2018
  • Construction: March 2018 - August 2019

PREQUALIFICATION OF SUBCONTRACTORS
ICON, LLC will be prequalifying subcontractors with criteria that has been pre-approved by the OFCC and the Riverside Local School District (RLSD) in accordance with the guidelines set forth by the State of Ohio for CMaR contracting. More information and documents related to this project delivery format can be found at http://ofcc.ohio.gov/Documents.aspx. Although ICON, LLC will share information on bids received with the Co-Owners, this is not a public bid opening. More information on bid delivery will be issued with the bid packages to pre-qualified subcontractors. Questions on the process should be sent to riversidebidquestions@iconohio.com.

Contractors wishing to be considered for pre-qualification must do so by providing information on the web-tool at the link below. Information will be treated as confidential, and only shared with the members of ICON, RLSD and the OFCC involved with the pre-qualification process.

SUBCONTRACTOR BID PACKAGES
ICON will be receiving bids from prequalified subcontractors on the bid packages listed below. It is also ICON’s intent to allow for the bidding of Combination Bids. We believe that this practice will allow for additional competition in the market, sustain the viability of local general contractors and allow the inclusion of smaller subcontractors who might otherwise be ineligible. Scope indicated below are for general information, only. Detailed scopes of work will be issued with each bid package.

03A - Cast in Place Concrete

• Excavation and backfill for foundations, curbs,
• Cast in Place Concrete - building foundations, piers, etc.
• Cast in Place Concrete - slab on grade
• Stone base & vapor barrier at SOG
• Insulation at slab/foundation
• Cast in Place Concrete - topping slab on precast-concrete plank
• Cast in Place Concrete - curbs, light and heavy duty concrete walks and pavement
• Frost slabs
• Equipment pads
• Stair pan fill
• Drain tile
• Joint sealants associated with above

03B - Precast Hollow Core Planks

• Precast hollow core planks
• Erection/Installation
• Bearing pads
• Grouting
• Safety cables and toe protection

04A - Masonry

• Masonry foundations
• Concrete Masonry Units
• Split face concrete masonry units
• Decorative concrete masonry units
• Stone trim units
• Masonry reinforcing and grouting
• Masonry accessories, flashings, moisture barriers
• Receive, set, prime & grout HM frames in masonry walls
• Receive and set loose lintels, bearing plates, imbeds
• Boardstock Air Barrier/Insulation at masonry walls
• Joint sealants associated with above
• Damproofing of subgrade masonry and concrete walls
• Mock-ups & Sample panels

05A - Structural Steel Fabrication and Erection

• Structural steel
• Base plates and anchor bolts
• Open web steel joists
• Roof deck
• Miscellaneous metals
• Stairs and railings
• Roof frames
• Roof drain pans
• Deck edge
• Safety cables and toe protection

06A - Carpentry and Specialties

• Interior rough carpentry, backing & sheathing
• Exterior rough carpentry, roof blocking
• EIFS
• Hollow metal doors & borrowed light frames in stud walls
• Door hardware
• Hollow metal doors
• Wood doors
• Coiling counter doors
• Overhead coiling grilles
• Sectional doors
• Operable partitions
• Wall and corner guards
• Finish carpentry and trim
• Interior architectural woodwork
• Visual display units
• Signage and directories
• Toilet partitions and screens
• Toilet accessories
• Cubicle curtains and track
• Metal lockers
• Metal storage shelving
• Display cases
• Fire extinguishers and cabinets
• Walkway coverings (Canopies)
• Educational equipment
• Projection screens
• Roller window shades
• Stage Curtains
• Athletic Equipment
• Scoreboard
• Hydraulic Elevator

07A - Thermoplastic Membrane Roofing

• Low-slopped roofing system
• Protection board
• Roof insulation
• Flashing, counter-flashing and cant
• Metal copings
• Scuppers
• Roof hatches
• Standing seam metal roof panels
• Metal wall panels
• Fixed louvers and vents
• Joint sealants associated with above

08A - Glass & Glazing

• Aluminum framed storefronts
• Aluminum entrances w/ associated hardware
• Aluminum windows
• Automatic door openers
• Interior glazing
• Fiberglass sandwich panel assemblies

09A - Interiors

• Light gauge metal framing - interior
• Gypsum board assemblies
• Cold formed metal framing
• Batt insulation and gypsum board at exterior walls
• Firestopping
• Acoustic and DW ceilings
• Access doors
• Interior expansion joint cover assemblies
• Resilient sheet flooring
• Resilient tile flooring
• Resilient athletic flooring
• Tile carpeting
• Tiling
• Sound absorbing wall units
• Sound absorbing ceiling units
• Painting

11A - Food Service Equipment

• Food service equipment
• Serving lines
• Dishwashers
• Coolers & freezers

12A - Casework

• Educational casework
• PLAM faced arch cabinets/custom casework
• Media Center/Library casework
• Office Furniture - Principal and assistant principal
• Office Furniture - Itinerant personnel
• Hardware and accessories

12B - Loose Furnishings - Bidding Later

• Educational furnishings
• Music Room furnishings
• Office / administration furnishings
• Student dining furnishings

21A - Fire Suppression

• Automatic sprinkler system
• Balance and testing
• Stand pipes

22A - Plumbing

• Backflow preventers
• Hot/ cold water service
• Pipe insulation
• Plumbing fixtures
• Mop sinks
• Shower units
• Grease traps
• Rough-in and connection of food service equipment
• Sanitary waste & vent systems
• Roof drain/ Storm water system
• Natural gas system
• Gas service piping and meter
• System testing

23A - HVAC & Integrated Automation

• Temporary heating requirements
• Heating Equipment & Distribution
• Cooling Equipment & Distribution
• Air Handling Equipment & Distribution
• Exhaust system
• Kitchen ventilation system
• HVAC systems insulation
• Associated fire dampers, fire safing
• Temperature control system
• Integrated building automation system

26A - Electrical

• Temporary electric requirements
• Electric site utilities
• Service & switchboards
• Grounding
• Branch panels, circuits and wiring
• Emergency power requirements
• Technology system provisions (conduit stubs, cable tray, etc.)
• Technology site pathways
• Lighting
• Rough-in for security system
• Site lighting
• Fire Alarm System

28A - Security, Sound & Technology Systems

• Data Communications System
• High-Density Wireless LAN
• Telephony System
• Classroom AV System
• Student Dining AV System
• Gymnasium AV System
• Central Sound and Paging
• Intercom System
• Wireless Clock System
• Digital Video Distribution System
• Public Safety Radio Repeater System
• Access Control System
• Intrusion Detection
• Video Surveillance System

31A - Sitework Contractor

• Video of existing conditions
• Establish site access, staging areas
• Earthwork, cut and fill to design subgrades
• Dust control during earthwork
• Backfill with engineered fill materials as indicated
• Erosion control measures
• Initial detention pond construction
• Sanitary, storm sewer installation
• Domestic and fire water services

32A - Final Site Development

• Staging area removal
• Stone pavement base
• Asphalt paving
• Striping
• Finish grade for all subgrades
• Topsoil spreading
• Detention pond conversion
• Playground surface
• Playground equipment
• Landscaping
• Flagpole
• Site furnishings
• Site signage
• Site fencing

33A - Wastewater Treatment & Onsite Disposal

• Installation of WW Treatment/Disposal System - Complete
• Excavation and backfill for installation
• Topsoil spreading