Revere Local Schools

The Revere Local School District projects consists of a $62 million program that includes a new 3-5 elementary school, new 9-12 high school, and various renovations to existing buildings.

  • Owner: Revere Local School District
  • Architect: BSHM Architects
  • CM at Risk: ICON, LLC.
  • Location: Richfield, Ohio
  • Size: 
  • Value: $62 Million
  • Anticipated Bid Date: 
  • Construction: 

PREQUALIFICATION OF SUBCONTRACTORS
ICON, LLC will be prequalifying subcontractors with criteria that has been pre-approved by the OFCC and the Revere Local School District in accordance with the guidelines set forth by the State of Ohio for CMaR contracting. More information and documents related to this project delivery format can be found at http://ofcc.ohio.gov/Documents.aspx. Although ICON, LLC will share information on bids received with the Co-Owners, this is not a public bid opening. More information on bid delivery will be issued with the bid packages to pre-qualified subcontractors. Questions on the process should be sent to reverebidquestions@iconohio.com.

Contractors wishing to be considered for pre-qualification must do so by providing information on the web-tool at the link below. Information will be treated as confidential, and only shared with the members of ICON and Revere Local Schools involved with the pre-qualification process.

SUBCONTRACTOR BID PACKAGES
ICON will be receiving bids from prequalified subcontractors on the bid packages listed below. It is also ICON’s intent to allow for the bidding of Combination Bids. We believe that this practice will allow for additional competition in the market, sustain the viability of local general contractors and allow the inclusion of smaller subcontractors who might otherwise be ineligible. Scope indicated below are for general information, only. Detailed scopes of work will be issued with each bid package.

03A – Concrete

• Selective demolition
• Excavation and backfill for foundations, curbs and walks
• Cast in place concrete – foundations, piers, elevator pit, stairs, ramps, retaining walls, slab on grade, slab on deck, curbs, walks and heavy duty paving
• Vapor barrier beneath concrete slab-on-grade
• Insulation at slab on grade and foundations
• All concrete reinforcing steel and wire mesh
• Receive and set steel leveling plates, embeds and anchor bolts provided by others
• Grout leveling plates and embeds
• Stone base – slab on grade, curbs, walks and heavy duty paving
• Drain tile associated with curbs, walks and heavy duty paving, and foundations
• Joint sealants associated with slab on grade, curbs, walks and heavy duty paving
• Mechanical equipment pads
• Monument sign foundation
• Concrete work at the softball field dugouts and walks
• Receive and set concrete filled steel bollards
• Exterior frost slabs
• Stair tread concrete infill
• Selective demolition in the renovated Area B
• All safety and protection associated with this work

04A – Masonry

• Concrete masonry units including burnished block
• Brick veneer
• Mortar and grout
• Masonry reinforcing
• Masonry accessories, ties, flashing, weep holes, etc.
• Spray foam insulation at all exterior cavity walls.
• Receive, set, backprime and grout HM frames in masonry walls, (furnished by others)
• Receive and set loose lintels and all masonry embeds, (furnished by others)
• Selective masonry demolition in renovated Area B
• Masonry work associated with the monument sign
• Masonry work associated with the softball field dugouts
• Mock up and sample panels
• All joint sealants associated with the exterior brick veneer control joints
• Maintenance of the temporary roadways, access and staging areas provided by others

05A – Metals

• Structural Steel
• Base plates, anchor bolts, stud plates
• Steel joist
• Metal decking and edge supports
• Safety cables and toe protection
• Metal fabrications
• Metal stairs, handrails and guards.
• Miscellaneous metals
• Furnish steel bollard pipe
• Loose lintels
• Roof opening frames
• Roof drain frames
• Access ladders
• Rooftop equipment screen wall framing

06A – Carpentry and Specialties

• All interior rough carpentry, backing and blocking
• Finish carpentry and trim
• Interior wood sheathing
• Plastic lumber fencing
• Furnish all hollow metal door and borrow light frames
• Furnish and install the hollow metal doors
• Furnish and install the flush wood doors
• Furnish and install the finish door hardware
• Furnish and install the overhead coiling doors
• Furnish and install the overhead coiling grilles
• Furnish and install the rolling counter shutters
• Furnish and install the Horizontal Sliding Accordion-Type Fire Doors
• Furnish and install the visual display boards
• Furnish and install the signage, plaques, and directories
• Furnish and install the dimensional letter signage
• Furnish and install the toilet partitions and screens
• Furnish and install the toilet accessories and mirrors
• Furnish and install the cubicle curtains and track
• Furnish and install operable panel partitions
• Furnish and install the mirror units
• Furnish and install the fire extinguishers and cabinets
• Furnish and install the metal storage shelving
• Furnish and install the metal lockers
• Furnish and install the gymnasium equipment
• Furnish and install the stage curtains and rigging
• Furnish and install the roller window shades
• Furnish and install the fixed audience seating
• Furnish and install the telescoping stands
• Furnish and install the telescoping platform chair system
• Furnish and install the hydraulic elevator
• Safety and temporary protection
• Temporary entrance partitions, doors and enclosures
• Temporary fire extinguishers
• Decorative glass railing (Alt #2 & 3)

07A – Roofing

• Low-sloped TPO roof system
• Roofing protection board
• Roofing insulation
• Roof flashing and cants
• Scuppers
• Gutters & downspouts
• Metal Fascia, flashing and trim
• Metal copings at parapet walls
• All required safety and protection
• Mock-up Requirements
• Dumpsters for this work

07B – Metal Wall Panels

• Formed metal wall panels
• Composite wall panels
• All required safety and protection
• Mock-up Requirements

08A – Glass & Glazing

• Glazed aluminum curtain walls
• Aluminum framed entrances and storefronts
• Installation of door hardware furnished by others.
• Interior & exterior glazing
• Joint sealants
• Mock-up Requirements

09A – Framing & Interiors

• Light gauge metal framing – interior and exterior
• Exterior wall sheathing/gypsum
• Exterior wood blocking and nailers
• Expansion Control
• Direct Applied Finish System (DAFS)
• GFRC column covers at canopies
• Set HM frames furnished by others
• Gypsum board assemblies including insulation
• Gypsum board shaft wall assemblies
• Acoustic and drywall ceilings
• Linear wood ceilings
• Access doors
• Firestopping systems
• Tiling
• Rubber recreational and athletic flooring
• Stage wood flooring
• Wood athletic flooring
• Resilient base and flooring
• Fluid applied athletic flooring
• Tile Carpet
• Stretched fabric wall systems
• Acoustical reflectors
• Acoustic panels
• Painting
• Selective demolition (Area B)
• Temp. protection and facilities
• Dumpsters
• Trash removal & cleanup requirements
• Maintenance of temporary perimeter fall protection

11A – Food Service Equipment

• Food Service Equipment
• Serving lines
• Dishwashers
• Cooking Equipment Hood with fire suppression
• Dishwasher Hood
• Coolers and freezers

12A – Casework

• Plastic Laminate Casework and Countertops
• Solid Surface Countertops
• Receptionist Desk
• Epoxy resin countertops and sinks
• Fume Hoods
• Display Cases
• Plastic Laminate Window Sills
• All wall blocking required for this work

21A – Fire Suppression

• Automatic sprinkler system
• Stand pipes
• Remote FDC and vault
• Fire protection firestopping
• Balancing and testing

22A – Plumbing

• Core Drilling
• Plumbing firestopping
• Hot/Cold water services
• Pipe insulation
• Plumbing fixtures
• Mop sinks
• Shower units
• Grease traps
• Rough-in and connection of food services equipment
• Floor Drains
• Sanitary waste and vent systems
• Storm water system
• Natural gas system
• Acid neutralization tank
• Sump pump at elevator pit
• Domestic water heaters
• Compressed air system
• Selective demolition in renovated Areas
• System testing

23A – HVAC

• HVAC General Provisions
• HVAC Basic Materials and Methods
• Selective HVAC Demo
• HVAC Firestopping
• HVAC Piping and all valves, meters, gauges, etc.
• Hangers and Supports for HVAC Piping and Equipment
• Mechanical Vibration Control
• Identification for HVAC Piping and Equipment
• Mechanical Insulation
• Variable Frequency Drives
• Testing, Adjusting and Balancing
• HVAC Instrumentation and Control
• HVAC Water Treatment
• All ductwork and accessories
• HVAC Air Distribution
• Central Heating Equipment
• Flues
• Roof Curbs
• Breeching, Chimneys, and Stacks
• Central Cooling Equipment
• Modular Air Handling Units
• Package Outdoor HVAC Equipment
• Decentralized HVAC Equipment
• Split System Air Conditioners
• Temporary HVAC provisions

26A – Electrical

• Temporary electrical requirements
• Selective Electrical Demolition
• Electrical site utilities
• Electrical Basic Materials and Methods
• Electrical General Provisions
• Electrical, Tech & Security Firestopping
• Power Distribution Equipment
• Grounding
• Low Voltage Dry Type Transformers
• Switchboards
• Surge Protective Devices
• Power Distribution System Studies
• Emergency Standby Generator
• Automatic Transfer Switches
• Technology system provisions including site pathways
• Lighting
• Networked Lighting Control System and functional testing
• Theatrical Lighting and Control System
• Athletic Scoreboard Systems
• Rough-in for security system
• Site lighting
• Voice Fire Alarm System

27A – Technology, Sound & Security Systems

• Technology General Provisions
• Communications, Telecom & security cabling
• Cabling Systems Administration
• Technology & Security Firestopping
• Pathway hardware
• Network electronics
• Wireless Access Point System and Propagation Study
• Telephone System
• Audio Visual Equipment
• Integrated Communication Systems
• Music Room Sound System
• Dining Room Sound System
• Gym Sound System
• Weight Room Sound System
• Auditorium Audio Visual System
• Classroom Multimedia Sound System
• Wireless GPS Clock System
• Integrated Security Management System (SMS)

31A – Site & Utilities

• SWPPP measures
• Tree protection
• Temporary staging, laydown and construction entrances
• Site layout work
• Misc. demolition and removals
• Salvage of select items
• Construction fencing relocation
• Building pad grading & prep
• Site Grading
• Strip, stockpile, and re-spread topsoil
• Site utilities – UG storm, sanitary, and water
• Protection and/or removal of existing site utilities
• Detention basin & Bio-Retention Areas
• Patching of public roadways, curbs and walks (if necessary)
• All safety and protection associated with this work

32A – Final Site Development

• Limestone Pavement Base
• Asphalt Paving
• Striping
• Topsoil prep
• Turfs and Grasses
• Softball field mixes
• Irrigation Work
• Landscaping/Plantings
• Tree Grates
• Outdoor Athletic Equipment
• Chain link fencing
• Decorative metal fencing
• Flagpole