North Ridgeville City Schools

North Ridgeville City School District is building a new, 232,803 square foot Elementary/Middle School that will house 2,070 students in grades 3-8 and will be built in accordance with the Ohio School Design Manual. The project also includes 22,000 square feet of additional building area and a new Athletic Stadium.

  • Owner: North Ridgeville City School District
  • Co-Owner: Ohio Facilities Construction Commission
  • Architect: TDA Architecture
  • CM at Risk: ICON, LLC.
  • Location: 34600 Bainbridge Road
  • Size: 232,803sf New 3-8 School & New Ranger Stadium
  • Value: $54 Million
  • Anticipated Bid Date: June 30, 2015 - 02A; July 30, 2015 - Remainder of bid packages
  • Construction: July 2015 through July 2017

PREQUALIFICATION OF SUBCONTRACTORS
ICON, LLC will be prequalifying subcontractors with criteria that has been pre-approved by the OFCC and the NRCSD in accordance with the guidelines set forth by the State of Ohio for CMaR contracting. More information and documents related to this project delivery format can be found at http://ofcc.ohio.gov/Documents.aspx. Although ICON, LLC will share information on bids received with the Co-Owners, this is not a public bid opening. More information on bid delivery will be issued with the bid packages to pre-qualified subcontractors. Questions on the process should be sent to NRCSbidquestions@iconohio.com.

Contractors wishing to be considered for pre-qualification must do so by providing information on the web-tool at the link below. Information will be treated as confidential, and only shared with the members of ICON, NRCSD and the OFCC involved with the pre-qualification process.

SUBCONTRACTOR BID PACKAGES
ICON will be receiving bids from prequalified subcontractors on the bid packages listed below. It is also ICON’s intent to allow for the bidding of Combination Bids. We believe that this practice will allow for additional competition in the market, sustain the viability of local general contractors and allow the inclusion of smaller subcontractors who might otherwise be ineligible. Scope indicated below are for general information, only. Detailed scopes of work will be issued with each bid package.

02A - Excavation - Preliminary Estimate: $2,651,968

• General site grading
• Erosion Control
• Stone pavement base
• Construction fencing
• Site Utilities - sanitary, storm, dom. water & gas
• Temporary staging and construction entrance
• Misc. Demolition & Removals
• Snow removal

03A - Cast in Place Concrete - Preliminary Estimate: $2,586,901

• Excavation for foundations w backfill
• Cast in Place Concrete - building foundations, piers, etc.
• Cast in Place Concrete - slab on grade
• Stone base & vapor barrier at SOG
• Insulation at slab/foundation
• Cast in Place Concrete - slab on deck
• Cast in Place Concrete - curbs and walks
• Equipment pads
• Stair pan fill
• Cast in Place Concrete - heavy duty concrete paving
• Draintile
• Joint sealants associated with above

04A - Masonry - Preliminary Estimate: $6,066,375

• Masonry foundations
• Concrete masonry units
• Brick Veneer
• Cast stone
• Ground face block
• Installation of salvaged items
• Masonry reinforcing and grouting
• Masonry accessories, flashings, moisture barriers
• Receive, set, prime, & grout HM frames in masonry walls
• Receive & set loose lintels, bearing plates, imbeds
• Insulation at masonry walls
• Precast lintels F&I
• Masonry locker bases
• Joint sealants associated with above
• Waterproofing/vapor barriers associated with masonry
• Mock-ups & sample panels

05A - Metals - Preliminary Estimate: $3,261,395

• Structural steel
• Base plates and anchor bolts
• Open web steel joists
• Floor and roof deck
• Miscellaneous metals
• Loose lintels
• Roof frames
• Roof drain pans
• Steel stairs & railings
• Toilet partition supports
• Deck edge
• Safety cables & toe protection
• Access ladders

06A - Carpentry & Specialties - Preliminary Estimate: $3,355,044

• Exterior Rough Carpentry
• Interior Rough Carpentry, Backing & Sheathing
• Hollow Metal door & borrow light frames
• Door hardware
• Hollow metal doors
• Wood doors
• Overhead coiling doors
• Counter shutters
• Fire doors and shutters
• Walk-off mats
• Wall and corner guards
• Finish carpentry and trim
• Visual display boards
• Signage and directories
• Toilet partitions and screens
• Toilet accessories
• Cubicle curtains and track
• Wire mesh partitions
• Student lockers
• Athletic lockers
• Staff lockers
• Locker benches
• Metal storage shelving
• Display cases
• Residential appliances
• Fire extinguishers & cabinets
• Educational Equipment
• Projection screens
• Roller Window Shades
• Gymnasium Equipment
• Gymnasium Dividers
• Telescoping bleachers
• Curtains and Rigging
• Hydraulic Elevators

07A - Metal Wall Panels - Preliminary Estimate: $330,032

• Prefinished metal siding
• Joint sealants associated with above
• Prefinished aluminum louver

07B – Thermoplastic Polyolefin (TPO) Roofing - Preliminary Estimate: $1,538,986

• Low-sloped roofing system
• Protection board
• Insulation
• Flashing, counter-flashings & cant
• Wood blocking associated with roofing
• Metal copings
• Scuppers
• Roof hatches
• Joint sealants associated with above

08A - Glass & Glazing - Preliminary Estimate: $1,656,291

• Curtainwall systems
• Storefront
• Aluminum Entrances
• Associated hardware
• FRP entry doors
• Automatic door openers
• Spandrel panels
• Interior glazing
• Non-framed mirrors

09A - Interiors - Preliminary Estimate: $3,355,977

• Light gauge metal framing - interior and exterior
• Gypsum board assemblies
• Tiling
• Acoustic & DW ceilings
• Access doors
• Resilient sheet flooring
• Resilient tile flooring
• Athletic wood flooring
• Stage Wood Flooring
• Carpet
• Acoustic panels and treatments
• Painting
• FRP Panels

11A - Food Service Equipment - Preliminary Estimate: $758,625

• Food service equipment
• Serving lines
• Dishwashers
• Hood w/ fire suppression
• Coolers & freezers

12A - Casework - Preliminary Estimate: $709,114

• Educational casework
• Art-room casework
• Associated sinks, faucets
• Music room casework
• Instrument storage lockers
• Life Skills casework
• Media Center casework
• Science lab casework
• Fume hoods
• Resin tops & sinks

12B Loose Furnishings - FF&E - Preliminary Estimate: $1,825,919

• Educational furnishings
• Media center furnishings
• Office / administration furnishings

13A – Grandstands and Pressbox - Preliminary Estimate: $1,292,697

• Grandstand Seating System
• Grandstand foundations
• Pressbox

21A - Fire Suppression - Preliminary Estimate: $540,258

• Automatic sprinkler system
• Fire pump / jockey pump
• Balance and testing
• Hook-up range hood system
• Stand pipes

22A - Plumbing - Preliminary Estimate: $2,520,560

• Water service entry / meter
• Backflow preventers
• Hot/cold water service
• Pipe insulation
• Plumbing fixtures
• Mop sinks
• Shower units
• Grease traps
• Rough-in and connection of food service equipment
• Rough-in and connection to science equipment
• Emergency eyewash - facewash
• Sanitary Waste & Vent Systems
• Acid waste system
• Compressed Air Systems
• Storm water system
• Natural gas system
• Gas Service and Meter
• System Testing

23A - HVAC & Integrated Automation - Preliminary Estimate: $6,277,774

• Temporary heating requirements
• Heating Equipment & Distribution
• Cooling Equipment & Distribution
• Air Handling Equipment & Distribution
• Exhaust system
• Associated fire dampers, fire safing
• Heat recovery
• Temperature Control System
• Integrated building automation system
• Balance and testing

26A - Electrical - Preliminary Estimate: $5,403,948

• Temporary electric requirements
• Electric site utilities
• Service & switchboards
• Grounding
• Branch panels, circuits and wiring
• Emergency power requirements
• Technology system provisions (conduit stubs, cable tray, etc.)
• Lighting
• Theatrical lighting and controls
• Electrical scoreboards
• Rough-in for security system
• Site Lighting
• Fire Alarm System

28A - Security, Sound & Technology Systems - Preliminary Estimate: $2,985,462

• Communications & Telecom
• Clock system
• Paging/Central Sound
• Music room sound
• Gym & Stage sound system
• Student dining audio/video system
• Classroom audio/video system
• Electronic Safety & Security

32A - Final Site Development - Preliminary Estimate: $2,335,239

• Asphalt Paving
• Repair stone base
• Striping
• Topsoil spreading
• Landscaping
• Irrigation System
• Flagpole
• Site furnishings
• Site signage
• Fencing Install

32B – Synthetic Turf & Field Drainage System - Preliminary Estimate: $607,154

• Turf Field Base & Drainage
• Athletic Surfacing
• Synthetic Turf
• Track & Field Drainage Systems

32C - Track and Field Event Surfacing - Preliminary Estimate: $111,151